IS WORK OVER?

Automation index

How much of a Financial controller’s job can AI already do?

A pack and a budget come earlier. Saying the margin is not that does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Financial controller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reporting, budgets and variances.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Close, provision and check against the books.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Management, plants and P&L owners.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, masters and data quality.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Audit, controls and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not dressing an EBIT.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Reporting, budgets and variances
  • Management, plants and P&L owners
  • Systems, masters and data quality
  • Audit, controls and documentation
  • Not dressing an EBIT
  • controller
  • control de gestion
  • financial controller

Sources for this job· O*NET 13-2011.00· ESCO/ISCO 2411

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Analyse my job

Jobs with similar scores

  1. 193Librarian26%
  2. 194Fundraiser26%
  3. 195Ship agent26%
  4. 197Drafter26%
  5. 198Web developer26%
  6. 199Game designer26%