Automation index
How much of a Financial controller’s job can AI already do?
A pack and a budget come earlier. Saying the margin is not that does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Financial controller
26%
AI can already do 26% of this job.
#196 / 623
View rankingFinancial controller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reporting, budgets and variances.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Close, provision and check against the books.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Management, plants and P&L owners.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Systems, masters and data quality.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Audit, controls and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not dressing an EBIT.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Reporting, budgets and variances
- Management, plants and P&L owners
- Systems, masters and data quality
- Audit, controls and documentation
- Not dressing an EBIT
- controller
- control de gestion
- financial controller
Sources for this job· O*NET 13-2011.00· ESCO/ISCO 2411
IS WORK OVER?
Mining engineer
22%
#341 / 623
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146