Automation index
How much of a Financial controller’s job can AI already do?
A pack and a budget come earlier. Saying the margin is not that does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Financial controller
26%
AI can already do 26% of this job.
#230 / 733
View rankingFinancial controller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reporting, budgets and variances.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Close, provision and check against the books.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Management, plants and P&L owners.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Systems, masters and data quality.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Audit, controls and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not dressing an EBIT.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Reporting, budgets and variances
- Management, plants and P&L owners
- Systems, masters and data quality
- Audit, controls and documentation
- Not dressing an EBIT
- controller
- control de gestion
- financial controller
Sources for this job· O*NET 13-2011.00· ESCO/ISCO 2411
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142