IS WORK OVER?

Automation index

How much of a Fire investigator’s job can AI already do?

A cause report comes earlier. Calling a short or a rag without selling it to the insurer do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Fire investigator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Scene, the origin and not treading it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cause, the short and the rag.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sample, the lab and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Report, the insurer and not selling it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The judge, the hearing and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Call the cause, and not selling it to the insurer.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fire origin
  • shorts
  • rags
  • samples
  • expert reports
  • insurers
  • the scene
  • not tread

Sources for this job· O*NET 33-2021.00· ESCO/ISCO 3119

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 419Dry cleaner22%
  2. 420School counsellor22%
  3. 421Orthodontist22%
  4. 423Fishmonger22%
  5. 424Order picker22%
  6. 425Strength and conditioning coach22%