IS WORK OVER?

Automation index

How much of a Firefighter’s job can AI already do?

A fire plan and a report write faster. Walking into a burning flat, cutting and carrying someone out do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Firefighter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, intervention plans and classroom training.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Prevention inspections and hydrant checks.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Fighting urban or wildland fire.
Estimate

No public source provides a precise figure. This is our estimate.

22%4%+0.9
Rescue at height, crash or collapse.
Estimate

No public source provides a precise figure. This is our estimate.

18%6%+1.1
Emergency care at the scene.
Estimate

No public source provides a precise figure. This is our estimate.

16%8%+1.3
Kit maintenance and station watch.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%12%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • put out fires
  • rescue
  • enter a fire
  • Prevention inspections and hydrant checks
  • Fighting urban or wildland fire
  • Rescue at height, crash or collapse
  • Emergency care at the scene
  • Kit maintenance and station watch
  • bombero
  • firefighter

Sources for this job· O*NET 33-2011.00· ESCO/ISCO 5411

Formwork carpenter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Build, plumb and brace the formwork.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Pour, vibrate and strike.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, crane and job safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a column crooked.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Read drawings, measure and order sheet
  • Build, plumb and brace the formwork
  • Pour, vibrate and strike
  • Site, crane and job safety
  • Logs, quantities and extras
  • Not leaving a column crooked
  • encofrador
  • formwork

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Analyse my job

Jobs with similar scores

  1. 640Paramedic14%
  2. 641Nanny13%
  3. 642Barber12%