Automation index
How much of a Firmware engineer’s job can AI already do?
An image comes earlier. Flashing without bricking the batch without skipping rollback do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Firmware engineer
22%
AI can already do 22% of this job.
#399 / 763
View rankingFirmware engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Image, the signature and the slot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Flash, the batch and the one that bricks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rollback, the test and not skipping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Boot, the brick and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The factory, the cadence and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Flash without bricking, and not skipping rollback.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- firmware images
- digital signature
- slots
- flash
- rollback
- boot
- factory batches
- not brick
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514
IS WORK OVER?
Tunnel engineer
22%
#410 / 763
View rankingTunnel engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Heading, the geology and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Water, the inflow and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Blast, the vibration and the building.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Segment, the ring and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not come down, and not hiding the water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tunnel headings
- support
- inflows
- blasts
- segments
- tunnel geology
- rings
- vibrations
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142