Automation index
How much of a Fleet dispatcher’s job can AI already do?
A GPS and a route come earlier. Covering the job when the truck stops do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Fleet dispatcher
28%
AI can already do 28% of this job.
#93 / 623
View rankingFleet dispatcher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Routes, GPS and the day’s plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
The stopped truck, the client and reassigning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Times, tachograph and not burning the hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Incidents, warehouse and the delivery that is not there.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The driver, the shortcut and not lying to the client.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cover the job, and not leaving the route half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dispatch the fleet
- truck GPS
- tachograph
- reassign routes
- driving hours
- delivery incidents
- day plan
- stopped truck
Sources for this job· O*NET 43-5032.00· ESCO/ISCO 4323
IS WORK OVER?
Building surveyor
22%
#321 / 623
View rankingBuilding surveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quantities, valuations and cost control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Working drawings and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, visits and safety.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, contractor and site team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, tests and the building book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a build that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Quantities, valuations and cost control
- Working drawings and trade coordination
- Site, visits and safety
- Client, contractor and site team
- Quality, tests and the building book
- Sign a build that will not fall
- arquitecto tecnico
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112