Automation index
How much of a Fleet dispatcher’s job can AI already do?
A GPS and a route come earlier. Covering the job when the truck stops do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Fleet dispatcher
28%
AI can already do 28% of this job.
#93 / 623
View rankingFleet dispatcher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Routes, GPS and the day’s plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
The stopped truck, the client and reassigning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Times, tachograph and not burning the hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Incidents, warehouse and the delivery that is not there.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The driver, the shortcut and not lying to the client.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cover the job, and not leaving the route half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dispatch the fleet
- truck GPS
- tachograph
- reassign routes
- driving hours
- delivery incidents
- day plan
- stopped truck
Sources for this job· O*NET 43-5032.00· ESCO/ISCO 4323
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142