Automation index
How much of a Fleet dispatcher’s job can AI already do?
A GPS and a route come earlier. Covering the job when the truck stops do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Fleet dispatcher
28%
AI can already do 28% of this job.
#93 / 743
View rankingFleet dispatcher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Routes, GPS and the day’s plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
The stopped truck, the client and reassigning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Times, tachograph and not burning the hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Incidents, warehouse and the delivery that is not there.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The driver, the shortcut and not lying to the client.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cover the job, and not leaving the route half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dispatch the fleet
- truck GPS
- tachograph
- reassign routes
- driving hours
- delivery incidents
- day plan
- stopped truck
Sources for this job· O*NET 43-5032.00· ESCO/ISCO 4323
IS WORK OVER?
Control engineer
22%
#386 / 743
View rankingControl engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PID, tune and the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the swing and the one that runs away.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Mode, manual and not leaving it for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Alarm, the interlock and not silencing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the recipe and not changing blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not swing, and not leaving manual for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- PID
- tune
- swings
- manual mode
- interlocks
- recipes
- control models
- not silence alarms
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149