IS WORK OVER?

Automation index

How much of a Flight dispatcher’s job can AI already do?

A flight plan comes earlier. Signing the fuel without leaving the aircraft short do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Flight dispatcher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, NOTAM, METAR and the fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Slot, alternates and weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The crew, the change and the late aircraft.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
MEL, restrictions and the go or no-go.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the diversion and recalculating in time.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not leaving it short, and signing the release.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • flight plans
  • NOTAM
  • METAR
  • fuel calc
  • slots
  • MEL
  • alternates
  • operational release

Sources for this job· O*NET 53-2022.00· ESCO/ISCO 3154

Furniture assembler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Manual, fittings and the parts count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Assemble, plumb and the wrong screw.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Up the stairs without marking the wall.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Adjust doors, drawers and the client watching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The small flat and the piece that will not fit whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not wobble, and not leaving a fitting out.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • assemble furniture
  • fittings
  • plumb wardrobes
  • adjust doors
  • drawers
  • up the stairs
  • parts count
  • screws

Sources for this job· O*NET 51-2092.00· ESCO/ISCO 8219

Analyse my job

Jobs with similar scores

  1. 91Retail salesperson28%
  2. 92Mobile developer28%
  3. 93Fleet dispatcher28%
  4. 95Graphic designer28%
  5. 96Video editor28%
  6. 97SEM specialist28%