Automation index
How much of a Flight dispatcher’s job can AI already do?
A flight plan comes earlier. Signing the fuel without leaving the aircraft short do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Flight dispatcher
28%
AI can already do 28% of this job.
#94 / 753
View rankingFlight dispatcher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, NOTAM, METAR and the fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Slot, alternates and weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The crew, the change and the late aircraft.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
MEL, restrictions and the go or no-go.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the diversion and recalculating in time.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not leaving it short, and signing the release.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- flight plans
- NOTAM
- METAR
- fuel calc
- slots
- MEL
- alternates
- operational release
Sources for this job· O*NET 53-2022.00· ESCO/ISCO 3154
IS WORK OVER?
Gas network engineer
22%
#397 / 753
View rankingGas network engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, pressures and the diameter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Trench, the weld and the one that was not x-rayed.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Leak, the detector and getting people out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cut, the bypass and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the rush and not covering without testing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the trench does not go up, and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- network pressures
- diameters
- trenches
- gas welds
- leaks
- detectors
- bypass
- x-rays
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145