Automation index
How much of a Flight dispatcher’s job can AI already do?
A flight plan comes earlier. Signing the fuel without leaving the aircraft short do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Flight dispatcher
28%
AI can already do 28% of this job.
#94 / 733
View rankingFlight dispatcher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, NOTAM, METAR and the fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Slot, alternates and weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The crew, the change and the late aircraft.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
MEL, restrictions and the go or no-go.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the diversion and recalculating in time.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not leaving it short, and signing the release.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- flight plans
- NOTAM
- METAR
- fuel calc
- slots
- MEL
- alternates
- operational release
Sources for this job· O*NET 53-2022.00· ESCO/ISCO 3154
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142