Automation index
How much of a Flight dispatcher’s job can AI already do?
A flight plan comes earlier. Signing the fuel without leaving the aircraft short do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Flight dispatcher
28%
AI can already do 28% of this job.
#94 / 623
View rankingFlight dispatcher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, NOTAM, METAR and the fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Slot, alternates and weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The crew, the change and the late aircraft.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
MEL, restrictions and the go or no-go.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the diversion and recalculating in time.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not leaving it short, and signing the release.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- flight plans
- NOTAM
- METAR
- fuel calc
- slots
- MEL
- alternates
- operational release
Sources for this job· O*NET 53-2022.00· ESCO/ISCO 3154
IS WORK OVER?
Prompt engineer
34%
#21 / 623
View rankingPrompt engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design prompts, tools and chains.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 58% | +13.9 |
Evals, datasets and regressions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Integrate with product and safety limits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Talk to the business about a good output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Watch hallucinations, bias and cost.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 20% | +2.8 |
Decide what the model gets, and what it does not.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 16% | +1.9 |
| Total | 100% | 34% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Design prompts, tools and chains
- Evals, datasets and regressions
- Integrate with product and safety limits
- Talk to the business about a good output
- Watch hallucinations, bias and cost
- prompt engineer
- ingeniero de prompts
- llm engineer
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512