Automation index
How much of a Flight dispatcher’s job can AI already do?
A flight plan comes earlier. Signing the fuel without leaving the aircraft short do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Flight dispatcher
28%
AI can already do 28% of this job.
#94 / 743
View rankingFlight dispatcher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, NOTAM, METAR and the fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Slot, alternates and weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The crew, the change and the late aircraft.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
MEL, restrictions and the go or no-go.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the diversion and recalculating in time.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not leaving it short, and signing the release.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- flight plans
- NOTAM
- METAR
- fuel calc
- slots
- MEL
- alternates
- operational release
Sources for this job· O*NET 53-2022.00· ESCO/ISCO 3154
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142