IS WORK OVER?

Automation index

How much of a Florist’s job can AI already do?

An order and a moodboard come earlier. A bouquet that holds and does not drop does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Florist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Orders, suppliers and a first design.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Compose, tie and condition.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Weddings, funerals and difficult clients.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Shop, window and waste.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cold room, water and the flower calendar.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not delivering a bouquet that dies tomorrow.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Orders, suppliers and a first design
  • Compose, tie and condition
  • Weddings, funerals and difficult clients
  • Shop, window and waste
  • Cold room, water and the flower calendar
  • florista
  • florist

Sources for this job· O*NET 27-1023.00· ESCO/ISCO 7549

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 672Choreographer18%
  2. 673Beautician18%
  3. 674Phlebotomist18%
  4. 676Civil Guard officer18%
  5. 677Gas fitter18%
  6. 678Gardener18%