Automation index
How much of a Foley artist’s job can AI already do?
A footstep list comes earlier. Foot, cloth and the hit sounding true do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Foley artist
22%
AI can already do 22% of this job.
#359 / 743
View rankingFoley artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
List, picture and the point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Footstep, cloth and the hit.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Stage, mics and the one that eats the dialogue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Mix, the editor and the one that misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The director, the taste and not loading extra steps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it sounds true, and not covering the voice.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- footsteps
- cloth
- hits
- foley stage
- picture
- mics
- the mix
- effects lists
Sources for this job· O*NET 27-4014.00· ESCO/ISCO 3521
IS WORK OVER?
Control engineer
22%
#386 / 743
View rankingControl engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PID, tune and the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the swing and the one that runs away.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Mode, manual and not leaving it for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Alarm, the interlock and not silencing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the recipe and not changing blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not swing, and not leaving manual for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- PID
- tune
- swings
- manual mode
- interlocks
- recipes
- control models
- not silence alarms
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149