Automation index
How much of a Foley artist’s job can AI already do?
A footstep list comes earlier. Foot, cloth and the hit sounding true do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Foley artist
22%
AI can already do 22% of this job.
#322 / 633
View rankingFoley artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
List, picture and the point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Footstep, cloth and the hit.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Stage, mics and the one that eats the dialogue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Mix, the editor and the one that misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The director, the taste and not loading extra steps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it sounds true, and not covering the voice.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- footsteps
- cloth
- hits
- foley stage
- picture
- mics
- the mix
- effects lists
Sources for this job· O*NET 27-4014.00· ESCO/ISCO 3521
IS WORK OVER?
Drafter
26%
#197 / 633
View rankingDrafter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, dimension and issue sheets.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Quantities, legends and revisions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coordinate with architect, engineer and site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drawing standards, stamps and issue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Archive, BIM and clashes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not issuing a drawing nobody can read.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model, dimension and issue sheets
- Quantities, legends and revisions
- Drawing standards, stamps and issue
- Archive, BIM and clashes
- Not issuing a drawing nobody can read
- delineante
- proyectista
- drafter
- cad technician
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118