Automation index
How much of a Foley artist’s job can AI already do?
A footstep list comes earlier. Foot, cloth and the hit sounding true do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Foley artist
22%
AI can already do 22% of this job.
#322 / 633
View rankingFoley artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
List, picture and the point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Footstep, cloth and the hit.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Stage, mics and the one that eats the dialogue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Mix, the editor and the one that misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The director, the taste and not loading extra steps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it sounds true, and not covering the voice.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- footsteps
- cloth
- hits
- foley stage
- picture
- mics
- the mix
- effects lists
Sources for this job· O*NET 27-4014.00· ESCO/ISCO 3521
IS WORK OVER?
Nuclear engineer
24%
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149