Automation index
How much of a Food engineer’s job can AI already do?
A plant balance and HACCP come earlier. Reformulating so it still tastes like food do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Food engineer
27%
AI can already do 27% of this job.
#158 / 623
View rankingFood engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Process, balances and shelf life.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, pasteurise and the batch that will not set.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
HACCP, labelling and the rules.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Reformulate, costs and the ingredient supplier.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Taste, marketing and not lying on the pack.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it tastes like food, and not shipping the bad batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- food process
- shelf life
- HACCP
- reformulate
- labelling
- pasteurise
- taste prototypes
- plant balances
Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2145
IS WORK OVER?
Building surveyor
22%
#321 / 623
View rankingBuilding surveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quantities, valuations and cost control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Working drawings and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, visits and safety.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, contractor and site team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, tests and the building book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a build that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Quantities, valuations and cost control
- Working drawings and trade coordination
- Site, visits and safety
- Client, contractor and site team
- Quality, tests and the building book
- Sign a build that will not fall
- arquitecto tecnico
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112