IS WORK OVER?

Automation index

How much of a Food engineer’s job can AI already do?

A plant balance and HACCP come earlier. Reformulating so it still tastes like food do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Food engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process, balances and shelf life.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Plant, pasteurise and the batch that will not set.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
HACCP, labelling and the rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Reformulate, costs and the ingredient supplier.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Taste, marketing and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it tastes like food, and not shipping the bad batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • food process
  • shelf life
  • HACCP
  • reformulate
  • labelling
  • pasteurise
  • taste prototypes
  • plant balances

Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2145

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 168Hepatologist27%
  2. 169Printing press operator27%
  3. 170Acoustics engineer27%
  4. 172Automation engineer27%
  5. 173Energy engineer27%
  6. 174Packaging engineer27%