Automation index
How much of a Food engineer’s job can AI already do?
A plant balance and HACCP come earlier. Reformulating so it still tastes like food do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Food engineer
27%
AI can already do 27% of this job.
#171 / 733
View rankingFood engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Process, balances and shelf life.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, pasteurise and the batch that will not set.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
HACCP, labelling and the rules.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Reformulate, costs and the ingredient supplier.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Taste, marketing and not lying on the pack.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it tastes like food, and not shipping the bad batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- food process
- shelf life
- HACCP
- reformulate
- labelling
- pasteurise
- taste prototypes
- plant balances
Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2145
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142