IS WORK OVER?

Automation index

How much of a Food engineer’s job can AI already do?

A plant balance and HACCP come earlier. Reformulating so it still tastes like food do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Food engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process, balances and shelf life.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Plant, pasteurise and the batch that will not set.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
HACCP, labelling and the rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Reformulate, costs and the ingredient supplier.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Taste, marketing and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it tastes like food, and not shipping the bad batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • food process
  • shelf life
  • HACCP
  • reformulate
  • labelling
  • pasteurise
  • taste prototypes
  • plant balances

Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2145

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 155Collections officer27%
  2. 156Wealth manager27%
  3. 157Printing press operator27%
  4. 159Automation engineer27%
  5. 160Energy engineer27%
  6. 161Packaging engineer27%