Automation index
How much of a Food engineer’s job can AI already do?
A plant balance and HACCP come earlier. Reformulating so it still tastes like food do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Food engineer
27%
AI can already do 27% of this job.
#158 / 623
View rankingFood engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Process, balances and shelf life.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, pasteurise and the batch that will not set.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
HACCP, labelling and the rules.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Reformulate, costs and the ingredient supplier.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Taste, marketing and not lying on the pack.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it tastes like food, and not shipping the bad batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- food process
- shelf life
- HACCP
- reformulate
- labelling
- pasteurise
- taste prototypes
- plant balances
Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2145
IS WORK OVER?
Nuclear engineer
24%
#267 / 623
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149