IS WORK OVER?

Automation index

How much of a Food engineer’s job can AI already do?

A plant balance and HACCP come earlier. Reformulating so it still tastes like food do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Food engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process, balances and shelf life.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Plant, pasteurise and the batch that will not set.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
HACCP, labelling and the rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Reformulate, costs and the ingredient supplier.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Taste, marketing and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it tastes like food, and not shipping the bad batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • food process
  • shelf life
  • HACCP
  • reformulate
  • labelling
  • pasteurise
  • taste prototypes
  • plant balances

Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2145

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 168Hepatologist27%
  2. 169Printing press operator27%
  3. 170Acoustics engineer27%
  4. 172Automation engineer27%
  5. 173Energy engineer27%
  6. 174Packaging engineer27%