Automation index
How much of a Food technologist’s job can AI already do?
An industrial recipe comes earlier. Coming out safe and tasting like food do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Food technologist
22%
AI can already do 22% of this job.
#397 / 633
View rankingFood technologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipe, process and shelf life.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the batch and the one that will not set.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
HACCP, labelling and not lying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Taste, marketing and not disguising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The supplier, the ingredient and not swapping blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Safe, and tasting like food.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- industrial recipes
- shelf life
- HACCP
- labelling
- taste
- plant batches
- ingredients
- food process
Sources for this job· O*NET 19-1012.00· ESCO/ISCO 2145
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142