IS WORK OVER?

Automation index

How much of a Food technologist’s job can AI already do?

An industrial recipe comes earlier. Coming out safe and tasting like food do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Food technologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Recipe, process and shelf life.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the batch and the one that will not set.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
HACCP, labelling and not lying.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Taste, marketing and not disguising.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The supplier, the ingredient and not swapping blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Safe, and tasting like food.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • industrial recipes
  • shelf life
  • HACCP
  • labelling
  • taste
  • plant batches
  • ingredients
  • food process

Sources for this job· O*NET 19-1012.00· ESCO/ISCO 2145

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 469Telephony technician22%
  2. 470Electoral officer22%
  3. 471Orthotic and prosthetic technician22%
  4. 473Family therapist22%
  5. 474Respiratory therapist22%
  6. 475Dyer22%