Automation index
How much of a Football coach’s job can AI already do?
A lineup and a clip come earlier. Going out to compete without breaking do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Football coach
22%
AI can already do 22% of this job.
#332 / 623
View rankingFootball coach
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Lineup, plan and the opponent clip.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Train, the one who is late and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Match, the changes and the one who boils.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Dressing room, the ego and not losing the group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The board, the parents and not picking the son under pressure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Compete, and not breaking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- lineups
- opponent clip
- training
- changes
- dressing room
- parents
- pick the side
- match plan
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Data engineer
31%
#36 / 623
View rankingData engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design pipelines, models and orchestration.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 50% | +12 |
Write SQL, Spark and data tests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 45% | +8.1 |
Incidents, quality and lineage in production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Talk to analysts and negotiate data contracts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Cloud cost, permissions and PII.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Decide architecture and technical debt.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 20% | +2.4 |
| Total | 100% | 31% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Design pipelines, models and orchestration
- Write SQL, Spark and data tests
- Cloud cost, permissions and PII
- Decide architecture and technical debt
- ingeniero de datos
- data engineer
- etl
Sources for this job· O*NET 15-1243.00· ESCO/ISCO 2511