IS WORK OVER?

Automation index

How much of a Football coach’s job can AI already do?

A lineup and a clip come earlier. Going out to compete without breaking do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Football coach

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lineup, plan and the opponent clip.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Train, the one who is late and the one who hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Match, the changes and the one who boils.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Dressing room, the ego and not losing the group.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The board, the parents and not picking the son under pressure.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Compete, and not breaking.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • lineups
  • opponent clip
  • training
  • changes
  • dressing room
  • parents
  • pick the side
  • match plan

Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422

Hydrogen technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
ATEX, purge and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Electrolyser, the stack and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Leak, detector and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Charge, the tube and not mixing with air.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the station and not skipping the purge.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No leak, and the protocol done.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ATEX
  • purge
  • electrolyser
  • H2 detectors
  • stacks
  • hydrogen stations
  • leaks
  • mix with air

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 335Funeral director22%
  2. 336Dosimetrist22%
  3. 337Section supervisor22%
  4. 339Costume designer22%
  5. 340Prosecutor22%
  6. 341Greengrocer22%