IS WORK OVER?

Automation index

How much of a Football coach’s job can AI already do?

A lineup and a clip come earlier. Going out to compete without breaking do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Football coach

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lineup, plan and the opponent clip.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Train, the one who is late and the one who hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Match, the changes and the one who boils.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Dressing room, the ego and not losing the group.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The board, the parents and not picking the son under pressure.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Compete, and not breaking.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • lineups
  • opponent clip
  • training
  • changes
  • dressing room
  • parents
  • pick the side
  • match plan

Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 329Diplomat22%
  2. 330Funeral director22%
  3. 331Section supervisor22%
  4. 333Costume designer22%
  5. 334Prosecutor22%
  6. 335Greengrocer22%