Automation index
How much of a Football coach’s job can AI already do?
A lineup and a clip come earlier. Going out to compete without breaking do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Football coach
22%
AI can already do 22% of this job.
#332 / 633
View rankingFootball coach
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Lineup, plan and the opponent clip.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Train, the one who is late and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Match, the changes and the one who boils.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Dressing room, the ego and not losing the group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The board, the parents and not picking the son under pressure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Compete, and not breaking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- lineups
- opponent clip
- training
- changes
- dressing room
- parents
- pick the side
- match plan
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Telecom engineer
25%
#235 / 633
View rankingTelecom engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Size, simulate and plan radio and fibre.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Projects, permits and sites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Field, measurements and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Incidents, NOC and operators.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, spectrum and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a town dark from a mistake.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Size, simulate and plan radio and fibre
- Projects, permits and sites
- Field, measurements and commissioning
- Incidents, NOC and operators
- Rules, spectrum and documentation
- Not leaving a town dark from a mistake
- ingeniero de telecomunicaciones
- telecom engineer
Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153