IS WORK OVER?

Automation index

How much of a Forensic scientist’s job can AI already do?

A lab protocol comes earlier. A result that holds in court without contaminating do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Forensic scientist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocol, chain and the sample.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Analyse, the blank and the one that contaminates.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Report, the link and not jumping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Court, the lawyer and holding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Police haste and not skipping the blank.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Hold in court, and not contaminating.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • chain of custody
  • blanks
  • forensic samples
  • the link
  • the hearing
  • lab protocols
  • expert reports
  • contamination

Sources for this job· O*NET 19-4092.00· ESCO/ISCO 3119

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Analyse my job

Jobs with similar scores

  1. 328Poultry farmer22%
  2. 329Botanist22%
  3. 330Chocolatier22%
  4. 332Hotel concierge22%
  5. 333Detective22%
  6. 334Diplomat22%