IS WORK OVER?

Automation index

How much of a Forestry engineer’s job can AI already do?

An inventory and a plan come earlier. Marking a forest and not letting it burn do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Forestry engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inventory, GIS and management plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Projects, felling and replanting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Forest, fire and pests.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Authorities, hunters and neighbours.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Biodiversity, tracks and water.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not signing a cut that leaves the forest empty.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Inventory, GIS and management plans
  • Projects, felling and replanting
  • Forest, fire and pests
  • Authorities, hunters and neighbours
  • Biodiversity, tracks and water
  • ingeniero forestal
  • forestry engineer

Sources for this job· O*NET 19-1032.00· ESCO/ISCO 2132

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 401Power engineer22%
  2. 402Geomatics engineer22%
  3. 403Railway engineer22%
  4. 405Geotechnical engineer22%
  5. 406Welding inspector22%
  6. 407EV charger installer22%