IS WORK OVER?

Automation index

How much of a Forestry engineer’s job can AI already do?

An inventory and a plan come earlier. Marking a forest and not letting it burn do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Forestry engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inventory, GIS and management plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Projects, felling and replanting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Forest, fire and pests.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Authorities, hunters and neighbours.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Biodiversity, tracks and water.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not signing a cut that leaves the forest empty.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Inventory, GIS and management plans
  • Projects, felling and replanting
  • Forest, fire and pests
  • Authorities, hunters and neighbours
  • Biodiversity, tracks and water
  • ingeniero forestal
  • forestry engineer

Sources for this job· O*NET 19-1032.00· ESCO/ISCO 2132

Residential porter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shift, the sheet and the letterboxes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hall, the neighbour and the one who is not.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fault, the water and calling it in.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Move, the lift and not scratching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The residents, the complaint and not taking sides.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Be there when it floods, and not losing the master.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fault sheets
  • master key
  • the hall
  • letterboxes
  • floods
  • moves
  • the residents
  • not take sides

Sources for this job· O*NET 39-6012.00· ESCO/ISCO 9629

Analyse my job

Jobs with similar scores

  1. 375Hydrologist22%
  2. 376Agronomist22%
  3. 377Mining engineer22%
  4. 379Welding inspector22%
  5. 380EV charger installer22%
  6. 381Social integrator22%