IS WORK OVER?

Automation index

How much of a Forklift operator’s job can AI already do?

A delivery note and a route come earlier. Lifting a pallet and not dropping it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Forklift operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Notes, locations and picking routes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, lift and stack.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Loads, centres of gravity and aisles.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Shift, radio and dock.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, incidents and counts.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not hitting anyone or a pallet.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Notes, locations and picking routes
  • Drive, lift and stack
  • Loads, centres of gravity and aisles
  • Shift, radio and dock
  • Logs, incidents and counts
  • Not hitting anyone or a pallet
  • carretillero
  • carretilla
  • forklift

Sources for this job· O*NET 53-7051.00· ESCO/ISCO 8344

Facilities engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, tickets and the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Roof, the chiller and the one that will not start.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Generator, the diesel and not leaving it dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fire, the pump and the monthly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The tenant, August and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That cooling does not die, and not leaving the generator dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS
  • PPM
  • chillers
  • generators
  • diesel
  • fire pumps
  • roofs
  • tickets

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 714Veterinary technician18%
  2. 715Actor17%
  3. 716Kitchen porter17%
  4. 718Air traffic controller17%
  5. 719Glazier17%
  6. 720Rebar worker17%