IS WORK OVER?

Automation index

How much of a Forklift operator’s job can AI already do?

A delivery note and a route come earlier. Lifting a pallet and not dropping it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Forklift operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Notes, locations and picking routes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, lift and stack.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Loads, centres of gravity and aisles.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Shift, radio and dock.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, incidents and counts.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not hitting anyone or a pallet.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Notes, locations and picking routes
  • Drive, lift and stack
  • Loads, centres of gravity and aisles
  • Shift, radio and dock
  • Logs, incidents and counts
  • Not hitting anyone or a pallet
  • carretillero
  • carretilla
  • forklift

Sources for this job· O*NET 53-7051.00· ESCO/ISCO 8344

Packaging engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Spec, 3D and the drop test.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The packing line and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material, recyclability and unit cost.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, die and pack colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Marketing, legal and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it survives the trip, and not oversizing the plastic.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design packs
  • drop test
  • packing line
  • recyclability
  • die-cut
  • unit cost
  • pack spec
  • 3D prototype

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 584Veterinary technician18%
  2. 585Actor17%
  3. 586Kitchen porter17%
  4. 588Air traffic controller17%
  5. 589Glazier17%
  6. 590Rebar worker17%