IS WORK OVER?

Automation index

How much of a Forklift operator’s job can AI already do?

A delivery note and a route come earlier. Lifting a pallet and not dropping it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Forklift operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Notes, locations and picking routes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, lift and stack.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Loads, centres of gravity and aisles.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Shift, radio and dock.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, incidents and counts.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not hitting anyone or a pallet.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Notes, locations and picking routes
  • Drive, lift and stack
  • Loads, centres of gravity and aisles
  • Shift, radio and dock
  • Logs, incidents and counts
  • Not hitting anyone or a pallet
  • carretillero
  • carretilla
  • forklift

Sources for this job· O*NET 53-7051.00· ESCO/ISCO 8344

Power-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-point, parameters and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Room, alarms and the one that trips.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Start, stop and not skipping the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, isolation and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the grid and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The set-point, and not tripping.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • set-points
  • control room
  • plant SOP
  • starts
  • isolations
  • alarms
  • dispatch
  • the grid

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Analyse my job

Jobs with similar scores

  1. 594Veterinary technician18%
  2. 595Actor17%
  3. 596Kitchen porter17%
  4. 598Air traffic controller17%
  5. 599Glazier17%
  6. 600Rebar worker17%