IS WORK OVER?

Automation index

How much of a Forklift operator’s job can AI already do?

A delivery note and a route come earlier. Lifting a pallet and not dropping it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Forklift operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Notes, locations and picking routes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, lift and stack.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Loads, centres of gravity and aisles.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Shift, radio and dock.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, incidents and counts.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not hitting anyone or a pallet.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Notes, locations and picking routes
  • Drive, lift and stack
  • Loads, centres of gravity and aisles
  • Shift, radio and dock
  • Logs, incidents and counts
  • Not hitting anyone or a pallet
  • carretillero
  • carretilla
  • forklift

Sources for this job· O*NET 53-7051.00· ESCO/ISCO 8344

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 694Veterinary technician18%
  2. 695Actor17%
  3. 696Kitchen porter17%
  4. 698Air traffic controller17%
  5. 699Glazier17%
  6. 700Rebar worker17%