IS WORK OVER?

Automation index

How much of a Forklift operator’s job can AI already do?

A delivery note and a route come earlier. Lifting a pallet and not dropping it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Forklift operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Notes, locations and picking routes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, lift and stack.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Loads, centres of gravity and aisles.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Shift, radio and dock.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, incidents and counts.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not hitting anyone or a pallet.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Notes, locations and picking routes
  • Drive, lift and stack
  • Loads, centres of gravity and aisles
  • Shift, radio and dock
  • Logs, incidents and counts
  • Not hitting anyone or a pallet
  • carretillero
  • carretilla
  • forklift

Sources for this job· O*NET 53-7051.00· ESCO/ISCO 8344

Switchboard operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Board, destinations and the shift.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The call, the one who is out and the message.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Emergencies, the anger and not losing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Directory, changes and not putting through wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the queues and not hanging up.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Put it through, and not hanging up on the one who waits.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switchboard
  • destinations
  • messages
  • directory
  • call queues
  • emergencies
  • telephony shifts
  • extension changes

Sources for this job· O*NET 43-2021.00· ESCO/ISCO 4223

Analyse my job

Jobs with similar scores

  1. 594Veterinary technician18%
  2. 595Actor17%
  3. 596Kitchen porter17%
  4. 598Air traffic controller17%
  5. 599Glazier17%
  6. 600Rebar worker17%