Automation index
How much of a Formwork carpenter’s job can AI already do?
A drawing and a sheet order come earlier. Formwork that does not blow out does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Formwork carpenter
16%
AI can already do 16% of this job.
#723 / 753
View rankingFormwork carpenter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order sheet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Build, plumb and brace the formwork.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Pour, vibrate and strike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, crane and job safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, quantities and extras.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a column crooked.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Read drawings, measure and order sheet
- Build, plumb and brace the formwork
- Pour, vibrate and strike
- Site, crane and job safety
- Logs, quantities and extras
- Not leaving a column crooked
- encofrador
- formwork
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115
IS WORK OVER?
Cost engineer
27%
#174 / 753
View rankingCost engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, rates and the budget.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the variance and the one that was not logged.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Change, the extra and not giving it away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Close, the dispute and not inflating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Management, the bid and not selling the reckless one.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The real number, and not the reckless bid.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measures
- unit rates
- variances
- extras
- disputes
- reckless bids
- works budgets
- closes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142