IS WORK OVER?

Automation index

How much of a Formwork carpenter’s job can AI already do?

A drawing and a sheet order come earlier. Formwork that does not blow out does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Formwork carpenter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Build, plumb and brace the formwork.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Pour, vibrate and strike.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, crane and job safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a column crooked.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Read drawings, measure and order sheet
  • Build, plumb and brace the formwork
  • Pour, vibrate and strike
  • Site, crane and job safety
  • Logs, quantities and extras
  • Not leaving a column crooked
  • encofrador
  • formwork

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 730Butcher16%
  2. 731Hospital porter16%
  3. 732Caregiver16%
  4. 734Stevedore16%
  5. 735Crane operator16%
  6. 736Miner16%