Automation index
How much of a Formwork carpenter’s job can AI already do?
A drawing and a sheet order come earlier. Formwork that does not blow out does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Formwork carpenter
16%
AI can already do 16% of this job.
#613 / 643
View rankingFormwork carpenter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order sheet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Build, plumb and brace the formwork.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Pour, vibrate and strike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, crane and job safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, quantities and extras.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a column crooked.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Read drawings, measure and order sheet
- Build, plumb and brace the formwork
- Pour, vibrate and strike
- Site, crane and job safety
- Logs, quantities and extras
- Not leaving a column crooked
- encofrador
- formwork
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115
IS WORK OVER?
Renewables engineer
27%
#165 / 643
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149