Automation index
How much of a Formwork carpenter’s job can AI already do?
A drawing and a sheet order come earlier. Formwork that does not blow out does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Formwork carpenter
16%
AI can already do 16% of this job.
#613 / 643
View rankingFormwork carpenter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order sheet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Build, plumb and brace the formwork.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Pour, vibrate and strike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, crane and job safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, quantities and extras.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a column crooked.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Read drawings, measure and order sheet
- Build, plumb and brace the formwork
- Pour, vibrate and strike
- Site, crane and job safety
- Logs, quantities and extras
- Not leaving a column crooked
- encofrador
- formwork
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115
IS WORK OVER?
Tailor
19%
#542 / 643
View rankingTailor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Pattern, measures and the fitting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cut, tack and the shoulder that will not hang.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fit, mark and the client who loses weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Buttonholes, lining and the hand finish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The groom, the deadline and not rushing the hem.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Hang on the body, and not leaving a high shoulder.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- take measures
- patterns
- tack
- buttonholes
- tailor fittings
- linings
- hem
- shoulder
Sources for this job· O*NET 51-6052.00· ESCO/ISCO 7531