IS WORK OVER?

Automation index

How much of a Formwork carpenter’s job can AI already do?

A drawing and a sheet order come earlier. Formwork that does not blow out does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Formwork carpenter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Build, plumb and brace the formwork.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Pour, vibrate and strike.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, crane and job safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a column crooked.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Read drawings, measure and order sheet
  • Build, plumb and brace the formwork
  • Pour, vibrate and strike
  • Site, crane and job safety
  • Logs, quantities and extras
  • Not leaving a column crooked
  • encofrador
  • formwork

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 610Butcher16%
  2. 611Hospital porter16%
  3. 612Caregiver16%
  4. 614Stevedore16%
  5. 615Crane operator16%
  6. 616Miner16%