Automation index
How much of a Funeral director’s job can AI already do?
A form and an obituary come earlier. Collecting someone and looking after the family do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Funeral director
22%
AI can already do 22% of this job.
#368 / 733
View rankingFuneral director
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paperwork, chapel, burial and cremation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Collection, thanatopraxy and care of the body.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
The family, the wake, and what is and is not possible.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Notice, flowers, hearse and the minute-by-minute of the rite.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cemetery, times and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Dignity, legal times and owning the service.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- arrange funerals
- file death paperwork
- collect the deceased
- support the family
- thanatopraxy
- run the wake
- arrange cremation
- notices
Sources for this job· O*NET 39-4031.00· ESCO/ISCO 5163
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142