Automation index
How much of a Funeral director’s job can AI already do?
A form and an obituary come earlier. Collecting someone and looking after the family do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Funeral director
22%
AI can already do 22% of this job.
#330 / 633
View rankingFuneral director
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paperwork, chapel, burial and cremation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Collection, thanatopraxy and care of the body.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
The family, the wake, and what is and is not possible.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Notice, flowers, hearse and the minute-by-minute of the rite.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cemetery, times and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Dignity, legal times and owning the service.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- arrange funerals
- file death paperwork
- collect the deceased
- support the family
- thanatopraxy
- run the wake
- arrange cremation
- notices
Sources for this job· O*NET 39-4031.00· ESCO/ISCO 5163
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142