Automation index
How much of a Funeral director’s job can AI already do?
A form and an obituary come earlier. Collecting someone and looking after the family do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Funeral director
22%
AI can already do 22% of this job.
#330 / 633
View rankingFuneral director
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paperwork, chapel, burial and cremation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Collection, thanatopraxy and care of the body.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
The family, the wake, and what is and is not possible.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Notice, flowers, hearse and the minute-by-minute of the rite.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cemetery, times and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Dignity, legal times and owning the service.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- arrange funerals
- file death paperwork
- collect the deceased
- support the family
- thanatopraxy
- run the wake
- arrange cremation
- notices
Sources for this job· O*NET 39-4031.00· ESCO/ISCO 5163
IS WORK OVER?
Mason
15%
#617 / 633
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112