IS WORK OVER?

Automation index

How much of a Funeral director’s job can AI already do?

A form and an obituary come earlier. Collecting someone and looking after the family do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Funeral director

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paperwork, chapel, burial and cremation.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Collection, thanatopraxy and care of the body.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
The family, the wake, and what is and is not possible.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Notice, flowers, hearse and the minute-by-minute of the rite.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cemetery, times and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Dignity, legal times and owning the service.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • arrange funerals
  • file death paperwork
  • collect the deceased
  • support the family
  • thanatopraxy
  • run the wake
  • arrange cremation
  • notices

Sources for this job· O*NET 39-4031.00· ESCO/ISCO 5163

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 327Hotel concierge22%
  2. 328Detective22%
  3. 329Diplomat22%
  4. 331Section supervisor22%
  5. 332Football coach22%
  6. 333Costume designer22%