Automation index
How much of a Funeral director’s job can AI already do?
A form and an obituary come earlier. Collecting someone and looking after the family do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Funeral director
22%
AI can already do 22% of this job.
#330 / 633
View rankingFuneral director
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paperwork, chapel, burial and cremation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Collection, thanatopraxy and care of the body.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
The family, the wake, and what is and is not possible.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Notice, flowers, hearse and the minute-by-minute of the rite.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cemetery, times and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Dignity, legal times and owning the service.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- arrange funerals
- file death paperwork
- collect the deceased
- support the family
- thanatopraxy
- run the wake
- arrange cremation
- notices
Sources for this job· O*NET 39-4031.00· ESCO/ISCO 5163
IS WORK OVER?
Structural engineer
26%
#204 / 633
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142