IS WORK OVER?

Automation index

How much of a Furniture assembler’s job can AI already do?

A manual comes earlier. A wardrobe that does not wobble and fits up the stairs do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Furniture assembler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Manual, fittings and the parts count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Assemble, plumb and the wrong screw.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Up the stairs without marking the wall.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Adjust doors, drawers and the client watching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The small flat and the piece that will not fit whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not wobble, and not leaving a fitting out.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • assemble furniture
  • fittings
  • plumb wardrobes
  • adjust doors
  • drawers
  • up the stairs
  • parts count
  • screws

Sources for this job· O*NET 51-2092.00· ESCO/ISCO 8219

BIM modeller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, families and clash detection.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
IFC, BEP and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site, the one who will not open the model, and the meeting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quantities, parameters and the 4D nobody uses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The last-minute change and not breaking the federated model.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be built, and not over-modelling.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BIM modelling
  • clash detection
  • Revit families
  • IFC
  • BEP
  • coordinate trades
  • BIM quantities
  • federated model

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 520Dressmaker19%
  2. 521Camp counsellor19%
  3. 522Ski instructor19%
  4. 524Plasterboard fitter19%
  5. 525Mosaicist19%
  6. 526Neurosurgeon19%