IS WORK OVER?

Automation index

How much of a Furniture assembler’s job can AI already do?

A manual comes earlier. A wardrobe that does not wobble and fits up the stairs do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Furniture assembler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Manual, fittings and the parts count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Assemble, plumb and the wrong screw.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Up the stairs without marking the wall.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Adjust doors, drawers and the client watching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The small flat and the piece that will not fit whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not wobble, and not leaving a fitting out.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • assemble furniture
  • fittings
  • plumb wardrobes
  • adjust doors
  • drawers
  • up the stairs
  • parts count
  • screws

Sources for this job· O*NET 51-2092.00· ESCO/ISCO 8219

Mechatronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, the PLC and the loop.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the arm and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Commissioning, the interlock and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cycle, the time and not inflating the figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the guard and not leaving them blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not take a finger, and starts.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • PLC
  • loops
  • robot cells
  • interlocks
  • commissioning
  • guards
  • cycle times
  • not jump the interlock

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 608Dressmaker19%
  2. 609Camp counsellor19%
  3. 610Ski instructor19%
  4. 612Plasterboard fitter19%
  5. 613Mosaicist19%
  6. 614Neurosurgeon19%