Automation index
How much of a Furniture assembler’s job can AI already do?
A manual comes earlier. A wardrobe that does not wobble and fits up the stairs do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Furniture assembler
19%
AI can already do 19% of this job.
#619 / 753
View rankingFurniture assembler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Manual, fittings and the parts count.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Assemble, plumb and the wrong screw.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Up the stairs without marking the wall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Adjust doors, drawers and the client watching.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The small flat and the piece that will not fit whole.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not wobble, and not leaving a fitting out.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- assemble furniture
- fittings
- plumb wardrobes
- adjust doors
- drawers
- up the stairs
- parts count
- screws
Sources for this job· O*NET 51-2092.00· ESCO/ISCO 8219
IS WORK OVER?
Site engineer
19%
#606 / 753
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142